MP211 Series PLC and ViewPLUS SCADA software were used to control the water distribution system of military base areas in Hakkari, Türkiye. Tank water level and pump status information, failure tracking is done through the system.

  • Over 50 base areas
  • Over 50 Mikrodev MP211 series PLC
  • 2000 data control via ViewPLUS SCADA
  • Water tank level monitoring
  • Aging pump control
  • Flow control
  • Pipeline pressure monitoring
  • Fault tracking
  • Instant chart tracking, historical report analysis

Other Post
All Posts
IEC 61850, IEC 60870, and DNP3: Strategic Protocol Selection and Architecture in Substation SCADA Projects
IEC 61850, IEC 60870, and DNP3: Strategic Protocol Selection and Architecture in Substation SCADA Projects
As modern energy grids evolve from one-way power flow to two-way, dynamic, and smart grid structures, the backbone of this transformation is formed by communication protocols. In a Substation Automati
Read More
What Is Modbus?
What Is Modbus?
What Is Modbus and What Is It Used For? Modbus is a communication protocol used in the industrial automation sector. It was developed by Modicon (now Schneider Electric) in 1979 primarily for com
Read More
What is PLC Programming? MOBDUS RTU Protocols in Mikrodev PLC Programming
What is PLC Programming? MOBDUS RTU Protocols in Mikrodev PLC Programming
PLCs (Programmable Logic Controllers), one of the indispensable elements of industrial automation, are one of the main tools used today to regulate and control complex production processes. PLC progra
Read More
Istanbul Anadolu Yakası OIZ Automatic Meter Reading System
Istanbul Anadolu Yakası OIZ Automatic Meter Reading System
Mikrodev IoT protocol gateway product family was preferred in the Istanbul Anadolu Yakası OIZ Automatic Meter Reading System Project in Türkiye. In the current system, over the MDC100 Series IoT Gatew
Read More
What Is a Remote Terminal Unit (RTU)? Its Fundamental Role in Field Automation
What Is a Remote Terminal Unit (RTU)? Its Fundamental Role in Field Automation
Imagine a water reservoir located outside the city. The water level inside drops rapidly at midnight, the pump needs to start, but there is no one on site. If it takes hours for a technician to arrive
Read More
Time Series Databases for SCADA: Why PostgreSQL + TimescaleDB Is a Powerful Combination
Time Series Databases for SCADA: Why PostgreSQL + TimescaleDB Is a Powerful Combination
In SCADA projects, thousands—sometimes even hundreds of thousands—of data points flow every second.Temperature, pressure, motor current, meter values… All of them are continuously generated together w
Read More
Israel Cellcom Telecommunication Base Stations Monitoring System
Israel Cellcom Telecommunication Base Stations Monitoring System
Mikrodev products were used at over 200 stations in the Israel Cellcom Telecommunication Base Stations Monitoring System. In the system, energy monitoring of base stations is carried out, and station
Read More
Turkcell Telecommunication Istanbul Seabus (IDO) – Ferry Rotary Antenna Automation System
Turkcell Telecommunication Istanbul Seabus (IDO) – Ferry Rotary Antenna Automation System
In the system, which aims to prevent Turkcell network disconnections in sea buses, the axis control of the base station is carried out according to the sea bus GPS coordinate information. 4 MP211
Read More
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
When you go out to the field, the picture is usually the same: distributed stations, pumping stations, reservoirs, substation yards, and at every point the same question arises: “What should we use to
Read More
ANKAMALL Building & Mall Automation System
ANKAMALL Building & Mall Automation System
Mikrodev MP211 Series PLC products and ViewPLUS SCADA software were used in ANKAMALL Building & Mall Automation System. Alarm monitoring, energy monitoring and system control of 278000 m2 area and
Read More
CATALOG