How To Buy
EN
TR

Mikrodev products were used in energy monitoring and controls throughout the Inegol Organized Industrial Zone in Bursa, Türkiye. Cutter position information, controls and fault tracking are done through the ViewPLUS SCADA system. Energy data of electricity meters and energy analyzers are transferred to SCADA with Mikrodev IoT protocol converters.

  • Over 30 Mikrodev RTU series
  • Over 100 MDC100 series MOD-C to MODBUS gateways
  • Over 100 MBS100 series MODBUS gateways
  • Over 10000 data control via ViewPLUS SCADA
  • Reading the data of cells in transformer substations via RTU340 (IEC 61850 MMS Client)
  • Motorized circuit breaker control and fault detection
  • Instant data transfer to ViewPLUS SCADA over IEC 60870-5-104 protocol
  • Monitoring rectifier alarms and fire alarms in substations
  • Monitoring the energy analyzers
  • Monitoring electric meters
  • Monitoring natural gas meters
  • Monitoring the waste-water flow meters
  • Monitoring the water meters
  • Monitoring and control of clean water wells

Other Post
All Posts
Data Security in Industrial SCADA Systems: Best Practices for SCADA Security, Industrial Cybersecurity, and Penetration Testing
Data Security in Industrial SCADA Systems: Best Practices for SCADA Security, Industrial Cybersecurity, and Penetration Testing
SCADA systems—at the heart of industrial automation—ensure the management of production lines and the continuity of processes. While these systems supervise critical sectors such as energy, water, gas
Read More
Republic of Türkiye Malatya İnönü University Infrastructure Control and Automation System
Republic of Türkiye Malatya İnönü University Infrastructure Control and Automation System
Mikrodev RTU300 series remote terminal unit and ViewPLUS SCADA software were preferred in Malatya İnönü University SCADA Automation System. Many different systems such as Water, Energy, Building HVAC
Read More
Republic of Türkiye General Directore of Agricultural Enterprises (TIGEM) Pivot Arm Irrigation, Fertilizing & Seed Dressing SCADA System
Republic of Türkiye General Directore of Agricultural Enterprises (TIGEM) Pivot Arm Irrigation, Fertilizing & Seed Dressing SCADA System
Mikrodev PLC and Remote I/O products were used in the Pivot Arm Irrigation, Fertilization and Seed Dressing SCADA System at more than 90 points in Konya - Türkiye region. Agricultural irrigation area
Read More
IEC 61131-3 Programming and Its Relation to the PLC Devices
IEC 61131-3 Programming and Its Relation to the PLC Devices
IEC 61131-3 Programming and Its Relation to the PLC Devices IEC 61131-3 Programming is a coding language used for programming standards for PLC devices. In this programming, there are function blocks
Read More
TUBITAK MAM(Marmara Research Center) MARTEK Building Automation & SCADA System
TUBITAK MAM(Marmara Research Center) MARTEK Building Automation & SCADA System
Building automation and SCADA system controls throughout TUBITAK Marmara Research Center MARTEK are made with Mikrodev products and software. Air conditioning, lighting and energy controls of the buil
Read More
TEI TUSAS Energy Management SCADA System
TEI TUSAS Energy Management SCADA System
In the energy management system, more than 50000 energy data are monitored and controlled over ViewPLUS SCADA software by using Mikrodev DCS and IoT protocol gateway products at more than 100 stations
Read More
Salda Lake Environmental Protection Wastewater Management System
Salda Lake Environmental Protection Wastewater Management System
MP110 series PLC and ViewPlus SCADA products were used in the wastewater drainage system of the structures around Salda Lake in Burdur Turkey under the leadership of the Republic of Türkiye Ministry o
Read More
IEC 62443 and PLC & SCADA Security: A Step-by-Step Guide (OT Security)
IEC 62443 and PLC & SCADA Security: A Step-by-Step Guide (OT Security)
Risks in Operational Technology (OT) are growing, and errors are turning into downtime and costs. IEC 62443 is a family of role- and process-oriented standards recognized as the reference for cybersec
Read More
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Imagine 3,000 alarms sounding in one shift. The operator tries to pick out the real danger within the noise, stress increases, and errors multiply. A critical pump stops a few minutes later, and the c
Read More
İstanbul Metropolitan Municipality Smart City SCADA System
İstanbul Metropolitan Municipality Smart City SCADA System
Smart city system control is carried out within the body of İstanbul Metropolitan Municipality Energy Management and Lighting Directorate. Energy monitoring and efficiency calculations, as well as el
Read More
CATALOG