Aramco, the oil company of Saudi Arabia, which is among the top three most valuable companies in the world, preferred MP211 Series Mikrodev PLC products for Emergency Shutdown System (ESD) controls of its facilities located at more than 50 stations.

To prevent possible leaks, explosions or other major types of failures in the existing system:

  • Compressor, pump and turbine controls
  • Emergency ventilation control
  • Steam pressure control
  • Line temperature controls
  • Waterproof doors and fire doors are checked.
Other Post
All Posts
Benefits of SCADA in Manufacturing
Benefits of SCADA in Manufacturing
In the dynamic landscape of modern manufacturing, efficiency and control are paramount. As industries evolve and technologies advance, staying ahead requires sophisticated solutions that optimize
Read More
Indonesia PLN Power Distribution System
Indonesia PLN Power Distribution System
Indonesian energy distribution company, energy monitoring and control system at more than 500 stations is made through the RTU300 series remote terminal unit. Reading the data of cells in transfo
Read More
Redundancy Design: Seamless Operation with Dual SCADA Servers, Dual RTUs, and Dual SIM
Redundancy Design: Seamless Operation with Dual SCADA Servers, Dual RTUs, and Dual SIM
An outage can start as ordinarily as a single relay falling silent in the field. Then alarms rain down, data flow stops, and decision-making is delayed. In sectors like energy, water, wastewater, oil
Read More
ANKAMALL Building & Mall Automation System
ANKAMALL Building & Mall Automation System
Mikrodev MP211 Series PLC products and ViewPLUS SCADA software were used in ANKAMALL Building & Mall Automation System. Alarm monitoring, energy monitoring and system control of 278000 m2 area and
Read More
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
When you go out to the field, the picture is usually the same: distributed stations, pumping stations, reservoirs, substation yards, and at every point the same question arises: “What should we use to
Read More
OPC UA and MQTT in Industrial Communication: Integration in Brownfield Factories
OPC UA and MQTT in Industrial Communication: Integration in Brownfield Factories
OPC UA and MQTT: Definition and Fundamental Differences In the context of industrial communication, OPC UA (Open Platform Communications Unified Architecture) and MQTT (Message Queuing Telemetry Tran
Read More
Increasing Efficiency: Using MODBUS Gateway in PLC Programming
Increasing Efficiency: Using MODBUS Gateway in PLC Programming
In the rapidly evolving landscape of industrial automation, the integration of Programmable Logic Controllers (PLCs) and communication protocols holds vital importance. The aim of this article is to p
Read More
FAQs (Frequently Asked Questions) About PLC
FAQs (Frequently Asked Questions) About PLC
Programmable logic control systems (PLC) have become an indispensable tool of modern industrial automation. Programmable logic controllers are an essential cog in industrial systems and provide flexib
Read More
Integration of Power Quality Data into SCADA: An IEC 61000-4-30-Focused Approach
Integration of Power Quality Data into SCADA: An IEC 61000-4-30-Focused Approach
If power quality is not visible, it cannot be managed. With SCADA integration, it is now possible to view Power Quality (PQ) data on a single screen, take rapid action during a fault, clarify maintena
Read More
What is IEC 60870-5-104 and why is it used in power system automation?
What is IEC 60870-5-104 and why is it used in power system automation?
IEC 60870-5-104 is a communication standard used for remote monitoring and control in electrical power systems. Since it is designed for telecontrol and telemetry, it is very common in substations, es
Read More
CATALOG