How To Buy
EN
TR

RTU and PLC products installed in more than 200 wells, warehouses and pumping centers throughout Trabzon are managed through the ViewPlus SCADA software in the TİSKİ Control Center.

  • Over 200 wells, warehouses and pump stations
  • Over 200 MP211 series PLC and RTU300 series RTU
  • 10000 data control via ViewPLUS SCADA
  • Hot stand by redundant SCADA
  • Data transmission to Viewplus SCADA via MODBUS and IEC 60870-5-104
  • Detection of water leaks, preventive or corrective actions
  • Electricity savings by using motors/pumps efficiently
  • Water quality control by monitoring parameters such as chlorine, PH meter, turbidity
  • Alarm tracking
  • Daily, monthly, annual reporting

 

Other Post
All Posts
Aramco Emergency Shutdown System (ESD)
Aramco Emergency Shutdown System (ESD)
Aramco, the oil company of Saudi Arabia, which is among the top three most valuable companies in the world, preferred MP211 Series Mikrodev PLC products for Emergency Shutdown System (ESD) controls of
Read More
Gaziantep City Water and Sewerage Administration (GASKI) Sludge Incineration Plant
Gaziantep City Water and Sewerage Administration (GASKI) Sludge Incineration Plant
Mikrodev PLC products were preferred in the follow-up and control of the processes of Türkiye's first sludge incineration plant in Gaziantep. The process is carried out at 850 to 1100 degrees Celsius.
Read More
Gaziantep City Water and Sewerage Administration (GASKI) Drinking Water Disinfection SCADA System
Gaziantep City Water and Sewerage Administration (GASKI) Drinking Water Disinfection SCADA System
In the GASKI Drinking Water Disinfection SCADA System, the chlorination of the water supply distribution networks and the water levels in the tank are monitored throughout in Gaziantep, Türkiye. In th
Read More
Trabzon City Water and Sewerage Administration (TİSKİ) Water SCADA System
Trabzon City Water and Sewerage Administration (TİSKİ) Water SCADA System
RTU and PLC products installed in more than 200 wells, warehouses and pumping centers throughout Trabzon are managed through the ViewPlus SCADA software in the TİSKİ Control Center. Over 200 well
Read More
MODBUS TCP Protocols and Applications in Mikrodev PLC Devices
MODBUS TCP Protocols and Applications in Mikrodev PLC Devices
In previous blog titled “What is PLC Programming?”, MODBUS PROTOCOL Blocks and MODBUS RTU MODBUS Master and MODBUS RTU Slave connection and programming in Mikrodev MP110 and MP211 PLC Series devices a
Read More
Kocaeli-Gebze VI. (IMES) OIZ Energy Tracking System
Kocaeli-Gebze VI. (IMES) OIZ Energy Tracking System
Mikrodev IoT protocol converter product family was preferred in the IMES Organized Industrial Zone Automatic Meter Reading System Project. In the current system, data of more than 600 electricity mete
Read More
Republic of Türkiye Malatya İnönü University Infrastructure Control and Automation System
Republic of Türkiye Malatya İnönü University Infrastructure Control and Automation System
Mikrodev RTU300 series remote terminal unit and ViewPLUS SCADA software were preferred in Malatya İnönü University SCADA Automation System. Many different systems such as Water, Energy, Building HVAC
Read More
Kayseray Energy Monitoring and Control SCADA System
Kayseray Energy Monitoring and Control SCADA System
Energy monitoring and control, catenary line monitoring and control and switch position information of more than 20 substations within Kayseray, a light rail public transportation system that started
Read More
PTP (IEEE 1588) vs NTP: Millisecond Precision Time Synchronization in Industrial Networks and SCADA
PTP (IEEE 1588) vs NTP: Millisecond Precision Time Synchronization in Industrial Networks and SCADA
How accurate is time alignment in industrial systems? Time synchronization means reliable data and accurate decisions in the field. An incorrect clock creates large gaps in fault analysis and quality
Read More
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Imagine 3,000 alarms sounding in one shift. The operator tries to pick out the real danger within the noise, stress increases, and errors multiply. A critical pump stops a few minutes later, and the c
Read More
CATALOG