RTU and PLC products installed in more than 200 wells, warehouses and pumping centers throughout Trabzon are managed through the ViewPlus SCADA software in the TİSKİ Control Center.

  • Over 200 wells, warehouses and pump stations
  • Over 200 MP211 series PLC and RTU300 series RTU
  • 10000 data control via ViewPLUS SCADA
  • Hot stand by redundant SCADA
  • Data transmission to Viewplus SCADA via MODBUS and IEC 60870-5-104
  • Detection of water leaks, preventive or corrective actions
  • Electricity savings by using motors/pumps efficiently
  • Water quality control by monitoring parameters such as chlorine, PH meter, turbidity
  • Alarm tracking
  • Daily, monthly, annual reporting

 

Other Post
All Posts
Salda Lake Environmental Protection Wastewater Management System
Salda Lake Environmental Protection Wastewater Management System
MP110 series PLC and ViewPlus SCADA products were used in the wastewater drainage system of the structures around Salda Lake in Burdur Turkey under the leadership of the Republic of Türkiye Ministry o
Read More
How Smart Grid Technologies Are Revolutionizing Energy Management
How Smart Grid Technologies Are Revolutionizing Energy Management
The Name of the Transformation in the Energy World — "Smart Grids" With rising global energy demand, the integration of renewable resources, and climate change, energy infrastructures are becoming sy
Read More
Industrial Scalability in MQTT with Sparkplug B: The Right Topology and Automatic Discovery
Industrial Scalability in MQTT with Sparkplug B: The Right Topology and Automatic Discovery
The number of devices in the IIoT field is increasing rapidly. The free structure of MQTT is flexible, but in large facilities, this freedom can turn into disorder. This is where MQTT Sparkplug B come
Read More
What is IEC 60870-5-104 and why is it used in power system automation?
What is IEC 60870-5-104 and why is it used in power system automation?
IEC 60870-5-104 is a communication standard used for remote monitoring and control in electrical power systems. Since it is designed for telecontrol and telemetry, it is very common in substations, es
Read More
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
RTU or PLC? A Guide to Making the Right Choice in Water and Energy Projects
When you go out to the field, the picture is usually the same: distributed stations, pumping stations, reservoirs, substation yards, and at every point the same question arises: “What should we use to
Read More
What is PLC Programming? MOBDUS RTU Protocols in Mikrodev PLC Programming
What is PLC Programming? MOBDUS RTU Protocols in Mikrodev PLC Programming
PLCs (Programmable Logic Controllers), one of the indispensable elements of industrial automation, are one of the main tools used today to regulate and control complex production processes. PLC progra
Read More
Digital Transformation in Transformer Substations: SCADA and Substation Automation
Digital Transformation in Transformer Substations: SCADA and Substation Automation
Energy is the lifeblood of modern civilization. In the process of delivering this energy from generation to the end consumer in an uninterrupted, high-quality, and secure manner, the most critical nod
Read More
Real-Time Visibility in Distribution Networks: Reducing Loss and Theft with Energy SCADA
Real-Time Visibility in Distribution Networks: Reducing Loss and Theft with Energy SCADA
In the evening hours, voltage drops on a feeder, lights flicker on some streets, the field team says “the transformer is overloaded,” but no one at the control center can speak clearly. This picture i
Read More
Istanbul Anadolu Yakası OIZ Automatic Meter Reading System
Istanbul Anadolu Yakası OIZ Automatic Meter Reading System
Mikrodev IoT protocol gateway product family was preferred in the Istanbul Anadolu Yakası OIZ Automatic Meter Reading System Project in Türkiye. In the current system, over the MDC100 Series IoT Gatew
Read More
SCL (CID, SED, ICD) Engineering in Substation Automation: From File to Commissioning
SCL (CID, SED, ICD) Engineering in Substation Automation: From File to Commissioning
In a substation automation project, everything seems to start with cables and panels. But the moment you open your first packet capture file in the field, you see the reality: the backbone that carrie
Read More