How To Buy
EN
TR

MP211 Series PLC and ViewPLUS SCADA software were used to control the water distribution system of military base areas in Hakkari, Türkiye. Tank water level and pump status information, failure tracking is done through the system.

  • Over 50 base areas
  • Over 50 Mikrodev MP211 series PLC
  • 2000 data control via ViewPLUS SCADA
  • Water tank level monitoring
  • Aging pump control
  • Flow control
  • Pipeline pressure monitoring
  • Fault tracking
  • Instant chart tracking, historical report analysis

Other Post
All Posts
Using SCADA Systems for Agricultural Irrigation
Using SCADA Systems for Agricultural Irrigation
SCADA systems, being used for remote monitoring and control of data elements in automation processes, play a crucial role in various sectors such as energy, petrochemicals, natural gas, food industry,
Read More
IEC 62443 and PLC & SCADA Security: A Step-by-Step Guide (OT Security)
IEC 62443 and PLC & SCADA Security: A Step-by-Step Guide (OT Security)
Risks in Operational Technology (OT) are growing, and errors are turning into downtime and costs. IEC 62443 is a family of role- and process-oriented standards recognized as the reference for cybersec
Read More
Mugla City Water and Sewerage Administration (MUSKI) Water SCADA System
Mugla City Water and Sewerage Administration (MUSKI) Water SCADA System
Drinking water controls of 350 stations throughout Mugla province in Türkiye are made through Mikrodev RTU products and ViewPLUS SCADA software. In the system, well and tank operation/failure conditio
Read More
Security of SCADA Systems
Security of SCADA Systems
Security of SCADA Systems In today's interconnected world, where technology permeates nearly every aspect of our lives, the security of supervisory control and data acquisition (SCADA) systems has be
Read More
What are the advantages of meter reading with MDC OSOS Server?
What are the advantages of meter reading with MDC OSOS Server?
MDC OSOS Server: An Innovative Solution for Modern Electricity Meter Data Management Introduction The automated collection and management of electricity consumption data is a critical need in modern
Read More
IoT Gateway Selection: Features, Performance Criteria, Protocol Support, and Device Capacity
IoT Gateway Selection: Features, Performance Criteria, Protocol Support, and Device Capacity
In industrial or commercial IoT projects, IoT gateways play a crucial role in ensuring accurate and fast data flow between devices. An IoT gateway brings together different protocols, devices, and app
Read More
Data Security in Industrial SCADA Systems: Best Practices for SCADA Security, Industrial Cybersecurity, and Penetration Testing
Data Security in Industrial SCADA Systems: Best Practices for SCADA Security, Industrial Cybersecurity, and Penetration Testing
SCADA systems—at the heart of industrial automation—ensure the management of production lines and the continuity of processes. While these systems supervise critical sectors such as energy, water, gas
Read More
Integration of Power Quality Data into SCADA: An IEC 61000-4-30-Focused Approach
Integration of Power Quality Data into SCADA: An IEC 61000-4-30-Focused Approach
If power quality is not visible, it cannot be managed. With SCADA integration, it is now possible to view Power Quality (PQ) data on a single screen, take rapid action during a fault, clarify maintena
Read More
Digital Transformation in Transformer Substations: SCADA and Substation Automation
Digital Transformation in Transformer Substations: SCADA and Substation Automation
Energy is the lifeblood of modern civilization. In the process of delivering this energy from generation to the end consumer in an uninterrupted, high-quality, and secure manner, the most critical nod
Read More
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Alarm Management ISA-18.2: SCADA Alarms, Event Management, Priority, and Operator Effectiveness
Imagine 3,000 alarms sounding in one shift. The operator tries to pick out the real danger within the noise, stress increases, and errors multiply. A critical pump stops a few minutes later, and the c
Read More
CATALOG